Design & Build of Sanitary Landfill Development and Construction of New Cabalan, Olongapo City – Financed by the Development Bank of the Philippines (DBP)
Total Landfill Area | 15 Hectares (Has.) | |
---|---|---|
Phase 1 Cell | 1 Hectare (Ha.) | |
Category | 3 Sanitary Landfill (SLF) | |
Capacity | 150 tons per day (TPD) landfill capacity |
Facilities
- Leachate Treatment Facility(LTF) – Integrated Fixed Film Activated Sludge(IFAS)
- Control room
- Weighbridge with weighbridge house, 40 tons capacity
- Wheel wash bay with high pressure washer
- Concrete Access Road
- Transmission Power lines
- Rehabilitation of Existing Dumpsite
Inquiry Form
Kindly fill out this form for your inquiry regarding PhilEco: