Project Details

Design, Build and Operate a Sanitary Solid Waste Management and Disposal Facility at Barangay Sinawal, City of General Santos

Design, Build and Operate a Sanitary Solid Waste Management and Disposal Facility at Barangay Sinawal

Total Landfill Area 63 hectares (Has.)
Phase 1 Cell 2.8 hectares (Has.)
Category 4 Sanitary Landfill (SLF)
Capacity 300 tons per day (TPD) landfill capacity
Facilities
  • Leachate Treatment Facility (LTF)
  • Sequencing Batch Reactor (SBR)
  • On-site Roads
  • Wheel-wash facilities
  • Unacceptable waste storage area
  • Materials recovery area / Composting plant
  • Maintenance Building

Inquiry Form

Kindly fill out this form for your inquiry regarding PhilEco:

Membership & Licenses