Design, Build and Operate a Sanitary Solid Waste Management and Disposal Facility at Barangay Sinawal
Total Landfill Area | 63 hectares (Has.) | |
---|---|---|
Phase 1 Cell | 2.8 hectares (Has.) | |
Category | 4 Sanitary Landfill (SLF) | |
Capacity | 300 tons per day (TPD) landfill capacity |
Facilities
- Leachate Treatment Facility (LTF)
- Sequencing Batch Reactor (SBR)
- On-site Roads
- Wheel-wash facilities
- Unacceptable waste storage area
- Materials recovery area / Composting plant
- Maintenance Building
Inquiry Form
Kindly fill out this form for your inquiry regarding PhilEco: